This finish is accomplished by moving steel lines through wet concrete. The result is long, vertical grooves, which can be exposed or non-exposed along the wall panels. Raking is also available at two or three inch random repeating patterns.
Select a finish from the menu to download an archived PDF, which can be viewed using the Adobe® Acrobat® Reader®.
|